PEB & Structure Fixing

Rafters, purlins, bracing, panels and compound structures.

What this service is

In plain terms.

Pre-engineered building erection is assembly under load. Rafters carry the roof from ridge to eaves; purlins and bracing hold the frame square and resist lateral load; panels close the envelope. The sequence matters as much as the components — temporary bracing must hold the frame until the permanent bracing is in, and a panel fixed to an unsquared frame will never seal.

Scope of work

What a standard engagement includes. Anything outside this is quoted separately and agreed in writing before it is executed.

PEB frame erection and alignment
Rafter installation — common, hip, valley and jack rafters
Purlin and sag rod installation
Temporary and permanent bracing — diagonal and cross bracing
Roof and wall panel installation
Precast concrete, metal and insulated panel fixing
Column post management and column post pile casting
Compound walls — chain link fencing and precast compound

Enquire about this service

An engineer who works on this specific service will call you back.

We use your details only to respond to this enquiry. We never sell or share them.

How we execute it

From enquiry to handover.

Six defined stages. You always know which one you are in and what closes it.

01

Foundation & anchor check

Anchor bolt positions and levels are verified against the frame drawing before any steel is lifted.

02

Frame erection

Columns and rafters erected in sequence with temporary bracing maintained throughout.

03

Alignment

The frame is plumbed and squared, and only then are connections finally torqued.

04

Bracing & purlins

Permanent bracing, purlins and sag rods installed to make the structure self-stable.

05

Panelling

Roof and wall panels fixed with correct laps, fasteners and sealing.

06

Handover

Torque records, alignment readings and photographic documentation of concealed connections.

Equipment

  • Mobile cranes and lifting tackle
  • Torque wrenches with calibration records
  • Alignment and plumbing instruments
  • Panel fixing tools and seaming equipment
  • Full body harnesses and fall-arrest systems

Team on the job

  • Erection engineer
  • Certified riggers and fitters
  • Panel fixing crew
  • Safety officer present through all erection

Compliance governing this work

  • Registered Civil Contractor — Government of Maharashtra
  • Documented erection sequence and temporary bracing plan
  • Work-at-height permits and inspected lifting tackle
  • Statutory labour cover for the full crew
See every licence and registration

On site

PEB & Structure Fixing in execution.

These slots are reserved for MGP's own site photography of this exact service.

Before you commit

Questions buyers actually ask.

Answered directly, including where the honest answer is a qualification rather than a yes.

Erection is our core scope, and we work with the fabricator you select. Where a client prefers a single point of responsibility, we can coordinate supply as well.