Underground OFC Route Laying with Road Crossings

Underground optical fibre route executed by open trenching with horizontal directional drilling at road and drain crossings, with full splicing and OTDR acceptance testing.

Client

Confidential — Network Operator

Location

Pune, Pune

Year

2024

Duration

Approximately 3 months

The challenge

What the client was up against.

The route crossed several developed roads and a storm water drain where open cutting was neither permitted nor practical, and reinstatement obligations on the cut sections were strict.

Our approach

What we actually did.

The route was walked and every crossing classified before quotation. Developed road and drain crossings were executed by horizontal directional drilling; the remaining stretches were open trenched with duct, warning tape and route markers. Reinstatement was completed to the authority's specification, and every fibre was tested bidirectionally on OTDR before handover.

Before and after

Drag the divider.

Opening condition on the left, completed work on the right — from the same position, so the comparison is honest.

BeforeAfter

Equipment deployed

Horizontal directional drilling rig
Trenching machines and excavators
Cable blowing machine
Fusion splicer and OTDR

What the client got

Road and drain crossings completed without surface cutting
Bidirectional OTDR traces recorded for every fibre
Surface reinstated to the authority's specification
Marked as-built route map handed over with splice records

From site

Execution photographs.