Underground OFC Route Laying with Road Crossings
Underground optical fibre route executed by open trenching with horizontal directional drilling at road and drain crossings, with full splicing and OTDR acceptance testing.
Hero photograph
HDD rig executing a road crossing for an OFC route with barricading and safety signage in place.
Client
Confidential — Network Operator
Location
Pune, Pune
Year
2024
Duration
Approximately 3 months
The challenge
What the client was up against.
The route crossed several developed roads and a storm water drain where open cutting was neither permitted nor practical, and reinstatement obligations on the cut sections were strict.
Our approach
What we actually did.
The route was walked and every crossing classified before quotation. Developed road and drain crossings were executed by horizontal directional drilling; the remaining stretches were open trenched with duct, warning tape and route markers. Reinstatement was completed to the authority's specification, and every fibre was tested bidirectionally on OTDR before handover.
Before and after
Drag the divider.
Opening condition on the left, completed work on the right — from the same position, so the comparison is honest.
After
Reinstated road surface and installed route markers after completion of the OFC route.
Before
Route alignment marked on the ground before excavation, showing the crossings to be drilled.
Equipment deployed
What the client got
From site
Execution photographs.
Project photograph 1
Open trench with HDPE duct and warning tape being laid.
Project photograph 2
Fusion splicing in progress inside the splicing van.
Project photograph 3
OTDR trace being recorded during acceptance testing.